You don't have javascript enabled. Good luck with that.
Pencarian
Sekda : Sodetan Kali Ciliwung Solusi Atasi Banjir Jakarta

Ciliwung Sodetan Construction Has Touched 54.7 Percent

This is a must, water from Ciliwung can be flowed into KBT

The construction of Ciliwung crossing channel (sodetan) that functions to flow water from Ciliwung River towards East Flood Canal (KBT) has reached 54.7 percent or 600 meters out of 1.27 kilometers.

City Secretary, Saefullah asserted the construction is very urgent to overcome flood problem.

Crossing to Be Provided at Rawa Babon Reservoir

"This is a must, water from Ciliwung can be flowed into KBT," he stated, Monday (4/3).

According to him, the KBT capacity is very adequate to flow water towards the upstream or the sea.

"Hopefully, the sodetan construction and Ciliwung normalization can be recontinued soon," he stated.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye990 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye981 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye940 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye717 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye613 personAnita Karyati